Email to Southeastern:
Dear Southeastern,
Just a quick email to congratulate you on doing exactly what you said you would do in an (unsolicited) email from you Sunday afternoon:
>We're expecting to operate our normal timetable today, Monday 20
>December. But, because of the severe weather at the weekend, there
>will be several cancelled services in the morning. Also many services
>will have fewer carriages than they usually do, because more of our
>trains are undergoing maintenance and repair.
The 07:09 Gravesend to Cannon Street service broke down at Dartford and then the train from Dartford to Cannon Street (unfortunately I've no idea what time this actually scheduled for) arrived some 10 - 15 minutes late, which to be fair is exactly the normal service that we have come to expect from you in these situations.
Please can you investigate and let me know the cause and resolution to the 07:09 issue and also the reason for the delay on the replacement train.
I look forward to hearing from you.
Thanks
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comments which we received on 20 and 23 December 2010.
Snow December 2010
On 20 December, the 07:09 train failed due to power problems caused by the ice. I am very sorry that your journey was disrupted by the severe weather which badly affected much of the UK transport infrastructure recently. For our part, our train performance was very disappointing and we are very sorry to all our passengers whose journeys were disrupted or who were unable to travel.
In our part of the UK, train services are vulnerable to snow and icy weather conditions. This is because our trains are powered by the ‘third’ conductor rail that runs alongside the track. Anything covering the conductor rail, such as compacted snow, ice or leaves, can affect a trains capacity to draw power from the track. Once ice has formed on the conductor rail, we must consult with Network Rail, who operate the infrastructure. Network Rail advise us about the number of services that we can run, and whether or not to start operating our contingency timetable (although sometimes this is not possible if trains have failed and are blocking certain lines).
It is Network Rail’s responsibility, as infrastructure controller, to ensure the tracks are clear of snow and ice. No criticism is implied of Network Rail, whose effort and commitment over the past weeks cannot be faulted, yet such has been the intensity of the weather that they have struggled to cope. While they had implemented measures in order to avoid a repeat of the poor performance last winter (such as special heaters at many locations which melt ice and snow on the points and rails), it appears that the severity of the weather rendered many of these ineffective and we are working with them to address this.
As you may be aware, we could not run services on many routes due to snow and ice on the conductor rails. When we were unable to operate services, we arranged for tickets to be accepted on Highspeed services, London Underground, DLR and London Bus services, and we arranged replacement buses, wherever possible. In spite of our efforts to do so, due to the weather conditions, it was not possible to provide replacement services in all locations, but we did our utmost to ensure that as many passengers as possible had the option to travel. Nevertheless, at such times we do ask passengers to only make essential journeys, partly because services are subject to delays, but also in case weather conditions deteriorate - which could leave passengers stranded.
Further to this, one of the problems that we faced since the snowfall was that, whilst most parts of our network were less affected by the weather conditions following a number of days without snowfall, due to its integrated nature, a delay on one part of the network can impact on other parts of the network; particularly on longer routes. As large sections of our network were still covered in ice and snow well into December, this continued to impact on punctuality for some time.
Another problem is the damage caused to many of our trains by running them on the icy tracks. As a result of this, many carriages needed to be taken out of service for repair. This resulted in a shortage of carriages. Whilst I can appreciate, and sincerely apologise for, the discomfort that this caused passengers, I trust that you will recognise our efforts to get passengers to their destinations, in spite of the challenges that we faced.
Once again, please accept my apologies for the problems that you experienced. You rightly expect us to consistently provide a good quality train service on which you can rely, and we understand the frustration you feel when, we do not provide the service that you expect. I can assure you that there will be no let-up in our determination to deliver a better service for you on a more consistent basis.
Yours sincerely
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comments which we received on 20 and 23 December 2010.
Snow December 2010
On 20 December, the 07:09 train failed due to power problems caused by the ice. I am very sorry that your journey was disrupted by the severe weather which badly affected much of the UK transport infrastructure recently. For our part, our train performance was very disappointing and we are very sorry to all our passengers whose journeys were disrupted or who were unable to travel.
In our part of the UK, train services are vulnerable to snow and icy weather conditions. This is because our trains are powered by the ‘third’ conductor rail that runs alongside the track. Anything covering the conductor rail, such as compacted snow, ice or leaves, can affect a trains capacity to draw power from the track. Once ice has formed on the conductor rail, we must consult with Network Rail, who operate the infrastructure. Network Rail advise us about the number of services that we can run, and whether or not to start operating our contingency timetable (although sometimes this is not possible if trains have failed and are blocking certain lines).
It is Network Rail’s responsibility, as infrastructure controller, to ensure the tracks are clear of snow and ice. No criticism is implied of Network Rail, whose effort and commitment over the past weeks cannot be faulted, yet such has been the intensity of the weather that they have struggled to cope. While they had implemented measures in order to avoid a repeat of the poor performance last winter (such as special heaters at many locations which melt ice and snow on the points and rails), it appears that the severity of the weather rendered many of these ineffective and we are working with them to address this.
As you may be aware, we could not run services on many routes due to snow and ice on the conductor rails. When we were unable to operate services, we arranged for tickets to be accepted on Highspeed services, London Underground, DLR and London Bus services, and we arranged replacement buses, wherever possible. In spite of our efforts to do so, due to the weather conditions, it was not possible to provide replacement services in all locations, but we did our utmost to ensure that as many passengers as possible had the option to travel. Nevertheless, at such times we do ask passengers to only make essential journeys, partly because services are subject to delays, but also in case weather conditions deteriorate - which could leave passengers stranded.
Further to this, one of the problems that we faced since the snowfall was that, whilst most parts of our network were less affected by the weather conditions following a number of days without snowfall, due to its integrated nature, a delay on one part of the network can impact on other parts of the network; particularly on longer routes. As large sections of our network were still covered in ice and snow well into December, this continued to impact on punctuality for some time.
Another problem is the damage caused to many of our trains by running them on the icy tracks. As a result of this, many carriages needed to be taken out of service for repair. This resulted in a shortage of carriages. Whilst I can appreciate, and sincerely apologise for, the discomfort that this caused passengers, I trust that you will recognise our efforts to get passengers to their destinations, in spite of the challenges that we faced.
Once again, please accept my apologies for the problems that you experienced. You rightly expect us to consistently provide a good quality train service on which you can rely, and we understand the frustration you feel when, we do not provide the service that you expect. I can assure you that there will be no let-up in our determination to deliver a better service for you on a more consistent basis.
Yours sincerely
No comments:
Post a Comment