Email to Southeastern:
Dear Southeastern,
Merry Christmas! I feel that we have really got to know each other this year and I look forward to another year of fun emailing.
:)
Regards
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your Christmas wishes, which we received on 20 December 2010.
Happy New Year
We would like to take this opportunity to wish you a Happy New Year in 2011.
Kind regards,
Southeastern
Friday, 24 December 2010
Thursday, 23 December 2010
23 December 2010
Sometimes, although not often, something happens on Southeastern that isn't bad and I genuinely believe that we should praise people who either do far more then their job or do their job well under exceptional circumstances. To anyone that was expecting another amusing rant: Sorry, I don't always complain!
Email to Southeastern:
Dear Southeastern,
I would like to take this opportunity to point out an amazing member of your staff Cedric (Unfortunately I didn't get a surname), who was working on Monday 20 December around 18:00 at St. Pancras Station.
Cedric showed quite amazing calm and professionalism in the face of one particular commuter who seemed to think that shouting and being rude to staff would be the best way to get his issue resolved and it was hardly Cedric’s fault that he’d not been told any more information than we had about what trains were running.
To be honest it was difficult to know if the queue I was in was to speak to Cedric or to punch our fellow commuter certainly the feeling in the queue was that punching said commuter (or arsehole as we referred to him), was the preferred option.
So once again I’d like to thank Cedric for putting a human face to Southeastern.
Regards
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comment which we received on 23 December 2010.
Staff conduct
I am delighted that you received excellent customer service from one of our staff members at St Pancras station, Cedric. Your comments will be brought to the attention of the Senior Management team, who are always appreciative of passenger comments.
While we recognise that Cedric felt he was simply doing his job, this is clearly conduct that we can be proud of. I can also assure you that such admirable behaviour is not allowed to pass without notice. To make certain that Cedric receives the recognition that he deserves, Caroline Bates, the local Station Manager, will also be made aware of your positive comments. In addition Ms Bates will inform Cedric of your appreciation.
I would like to thank you for taking the trouble to bring this encouraging experience to our attention. I also hope that your encounters with our staff continue similarly.
Yours sincerely
Southeastern
Email to Southeastern:
Dear Southeastern,
I would like to take this opportunity to point out an amazing member of your staff Cedric (Unfortunately I didn't get a surname), who was working on Monday 20 December around 18:00 at St. Pancras Station.
Cedric showed quite amazing calm and professionalism in the face of one particular commuter who seemed to think that shouting and being rude to staff would be the best way to get his issue resolved and it was hardly Cedric’s fault that he’d not been told any more information than we had about what trains were running.
To be honest it was difficult to know if the queue I was in was to speak to Cedric or to punch our fellow commuter certainly the feeling in the queue was that punching said commuter (or arsehole as we referred to him), was the preferred option.
So once again I’d like to thank Cedric for putting a human face to Southeastern.
Regards
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comment which we received on 23 December 2010.
Staff conduct
I am delighted that you received excellent customer service from one of our staff members at St Pancras station, Cedric. Your comments will be brought to the attention of the Senior Management team, who are always appreciative of passenger comments.
While we recognise that Cedric felt he was simply doing his job, this is clearly conduct that we can be proud of. I can also assure you that such admirable behaviour is not allowed to pass without notice. To make certain that Cedric receives the recognition that he deserves, Caroline Bates, the local Station Manager, will also be made aware of your positive comments. In addition Ms Bates will inform Cedric of your appreciation.
I would like to thank you for taking the trouble to bring this encouraging experience to our attention. I also hope that your encounters with our staff continue similarly.
Yours sincerely
Southeastern
Monday, 20 December 2010
20 December 2010
Email to Southeastern:
Dear Southeastern,
Just a quick email to congratulate you on doing exactly what you said you would do in an (unsolicited) email from you Sunday afternoon:
>We're expecting to operate our normal timetable today, Monday 20
>December. But, because of the severe weather at the weekend, there
>will be several cancelled services in the morning. Also many services
>will have fewer carriages than they usually do, because more of our
>trains are undergoing maintenance and repair.
The 07:09 Gravesend to Cannon Street service broke down at Dartford and then the train from Dartford to Cannon Street (unfortunately I've no idea what time this actually scheduled for) arrived some 10 - 15 minutes late, which to be fair is exactly the normal service that we have come to expect from you in these situations.
Please can you investigate and let me know the cause and resolution to the 07:09 issue and also the reason for the delay on the replacement train.
I look forward to hearing from you.
Thanks
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comments which we received on 20 and 23 December 2010.
Snow December 2010
On 20 December, the 07:09 train failed due to power problems caused by the ice. I am very sorry that your journey was disrupted by the severe weather which badly affected much of the UK transport infrastructure recently. For our part, our train performance was very disappointing and we are very sorry to all our passengers whose journeys were disrupted or who were unable to travel.
In our part of the UK, train services are vulnerable to snow and icy weather conditions. This is because our trains are powered by the ‘third’ conductor rail that runs alongside the track. Anything covering the conductor rail, such as compacted snow, ice or leaves, can affect a trains capacity to draw power from the track. Once ice has formed on the conductor rail, we must consult with Network Rail, who operate the infrastructure. Network Rail advise us about the number of services that we can run, and whether or not to start operating our contingency timetable (although sometimes this is not possible if trains have failed and are blocking certain lines).
It is Network Rail’s responsibility, as infrastructure controller, to ensure the tracks are clear of snow and ice. No criticism is implied of Network Rail, whose effort and commitment over the past weeks cannot be faulted, yet such has been the intensity of the weather that they have struggled to cope. While they had implemented measures in order to avoid a repeat of the poor performance last winter (such as special heaters at many locations which melt ice and snow on the points and rails), it appears that the severity of the weather rendered many of these ineffective and we are working with them to address this.
As you may be aware, we could not run services on many routes due to snow and ice on the conductor rails. When we were unable to operate services, we arranged for tickets to be accepted on Highspeed services, London Underground, DLR and London Bus services, and we arranged replacement buses, wherever possible. In spite of our efforts to do so, due to the weather conditions, it was not possible to provide replacement services in all locations, but we did our utmost to ensure that as many passengers as possible had the option to travel. Nevertheless, at such times we do ask passengers to only make essential journeys, partly because services are subject to delays, but also in case weather conditions deteriorate - which could leave passengers stranded.
Further to this, one of the problems that we faced since the snowfall was that, whilst most parts of our network were less affected by the weather conditions following a number of days without snowfall, due to its integrated nature, a delay on one part of the network can impact on other parts of the network; particularly on longer routes. As large sections of our network were still covered in ice and snow well into December, this continued to impact on punctuality for some time.
Another problem is the damage caused to many of our trains by running them on the icy tracks. As a result of this, many carriages needed to be taken out of service for repair. This resulted in a shortage of carriages. Whilst I can appreciate, and sincerely apologise for, the discomfort that this caused passengers, I trust that you will recognise our efforts to get passengers to their destinations, in spite of the challenges that we faced.
Once again, please accept my apologies for the problems that you experienced. You rightly expect us to consistently provide a good quality train service on which you can rely, and we understand the frustration you feel when, we do not provide the service that you expect. I can assure you that there will be no let-up in our determination to deliver a better service for you on a more consistent basis.
Yours sincerely
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comments which we received on 20 and 23 December 2010.
Snow December 2010
On 20 December, the 07:09 train failed due to power problems caused by the ice. I am very sorry that your journey was disrupted by the severe weather which badly affected much of the UK transport infrastructure recently. For our part, our train performance was very disappointing and we are very sorry to all our passengers whose journeys were disrupted or who were unable to travel.
In our part of the UK, train services are vulnerable to snow and icy weather conditions. This is because our trains are powered by the ‘third’ conductor rail that runs alongside the track. Anything covering the conductor rail, such as compacted snow, ice or leaves, can affect a trains capacity to draw power from the track. Once ice has formed on the conductor rail, we must consult with Network Rail, who operate the infrastructure. Network Rail advise us about the number of services that we can run, and whether or not to start operating our contingency timetable (although sometimes this is not possible if trains have failed and are blocking certain lines).
It is Network Rail’s responsibility, as infrastructure controller, to ensure the tracks are clear of snow and ice. No criticism is implied of Network Rail, whose effort and commitment over the past weeks cannot be faulted, yet such has been the intensity of the weather that they have struggled to cope. While they had implemented measures in order to avoid a repeat of the poor performance last winter (such as special heaters at many locations which melt ice and snow on the points and rails), it appears that the severity of the weather rendered many of these ineffective and we are working with them to address this.
As you may be aware, we could not run services on many routes due to snow and ice on the conductor rails. When we were unable to operate services, we arranged for tickets to be accepted on Highspeed services, London Underground, DLR and London Bus services, and we arranged replacement buses, wherever possible. In spite of our efforts to do so, due to the weather conditions, it was not possible to provide replacement services in all locations, but we did our utmost to ensure that as many passengers as possible had the option to travel. Nevertheless, at such times we do ask passengers to only make essential journeys, partly because services are subject to delays, but also in case weather conditions deteriorate - which could leave passengers stranded.
Further to this, one of the problems that we faced since the snowfall was that, whilst most parts of our network were less affected by the weather conditions following a number of days without snowfall, due to its integrated nature, a delay on one part of the network can impact on other parts of the network; particularly on longer routes. As large sections of our network were still covered in ice and snow well into December, this continued to impact on punctuality for some time.
Another problem is the damage caused to many of our trains by running them on the icy tracks. As a result of this, many carriages needed to be taken out of service for repair. This resulted in a shortage of carriages. Whilst I can appreciate, and sincerely apologise for, the discomfort that this caused passengers, I trust that you will recognise our efforts to get passengers to their destinations, in spite of the challenges that we faced.
Once again, please accept my apologies for the problems that you experienced. You rightly expect us to consistently provide a good quality train service on which you can rely, and we understand the frustration you feel when, we do not provide the service that you expect. I can assure you that there will be no let-up in our determination to deliver a better service for you on a more consistent basis.
Yours sincerely
Wednesday, 15 December 2010
15 December 2010
Email to Southeastern:
Dear Southeastern,
Were you aware that in the many-worlds interpretation Quantum Mechanics every event in the universe can and has actually already happened? This means that in some universe somewhere there is actually a Southeastern who can run their trains on time; on a more practical note maybe you could update your Passenger Charter to say that trains may not actually appear in this universe?
Which I think is what happened on Wednesday 15th December. The 07:09 Gravesend to Cannon Street was shown as delayed from 07:05 to 07:24 when it suddenly vanished from the board. It was not cancelled as there were no announcements from the station staff or messages on the display boards so I can only assume that it arrived at a Gravesend station in a parallel universe!
I have often though that Gravesend was an odd place but this seems to confirm my suspicions that Gravesend station actually sits very close to a rip in fabric of the very universe itself.
Could you investigate what happened to this train before I submit my papers for the Physics Nobel Prize?
Thanks in advance
Elliot
South Eastern Reply:
Dear Mr Uttridge
Thank you for your email of 17 December, with regard to the running of the 07.09 Gravesend to London Cannon Street service on that morning.
This service, which is the 06.57 Strood to London Cannon Street train, was delayed at Strood by 17 minutes because it was sent to the wrong platform by the signallers (a platform that did not have monitor screens at the end of the platform to allow the driver to carry out the dispatch procedure). As a result, the procedure had to be carried out by platform staff. Because of the delay, the train ran fast between Strood and Gravesend, and it was then taken out of service at Dartford.
I am sorry that we failed to tell you what had happened to this service, but I hope that this has now clarified the position.
Yours sincerely
South Eastern
South Eastern Reply:
Dear Mr Uttridge
Thank you for your email of 17 December, with regard to the running of the 07.09 Gravesend to London Cannon Street service on that morning.
This service, which is the 06.57 Strood to London Cannon Street train, was delayed at Strood by 17 minutes because it was sent to the wrong platform by the signallers (a platform that did not have monitor screens at the end of the platform to allow the driver to carry out the dispatch procedure). As a result, the procedure had to be carried out by platform staff. Because of the delay, the train ran fast between Strood and Gravesend, and it was then taken out of service at Dartford.
I am sorry that we failed to tell you what had happened to this service, but I hope that this has now clarified the position.
Yours sincerely
South Eastern
Tuesday, 23 November 2010
23 November 2010
Email to Southeastern:
Dear Southeastern,
Re: London Bridge to Gravesend - sometime between 17:30 and 18:30
I'm pretty sure that being repeatedly kicked in the testicles is not only more fun than last night’s journey home but is also likely to have imparted more information than either the station staff or display boards managed, as all the boards showed "delayed" but no actual information on expected times or indeed what platforms we might expect them to arrive at.
Shutting Cannon Street (my normal station) was however a work of brilliance which I'm sure was a carefully calculated plan. To be honest I can't help but think that Southeastern are involved in some kind of physiological experiment to just how far you can push the human psychology. If not then I would like to put this forward to either your suggestion box or I might contact ITV with an outline for a show called "I'm a commuter, get me out of here"
So to recap:
1) Trains were running 40 minutes late
2) Trains were cancelled, although in the interest of full disclosure my train wasn't cancelled and amazingly wasn't cancelled at Dartford like normal
3) Station announcements amounted to "Everything is late; we're not sure what's arriving next."
Now it's been made clear from previous emails that you will not consider compensation because of your ridiculously skewed passenger charter and that the fact you are very sorry should be enough for me. So let's skip the formalities where I ask for something, you quote pages of your charter at me and I reject your kind offer of nothing at all; I would like you to consider the following: You may be aware that this month is Movember which is a charity event raising money for (in the UK) The Prostate Cancer Charity. Please would you consider making a donation to this worthwhile cause? You can donate via my page below.
http://uk.movember.com/donate/your-details/member_id/1256686/
Go on, give me a chance to tell people that Southeastern have done something good for once.
Thanks
Elliot
Southeastern reply: (but no donation!)
Dear Mr Uttridge
Thank you for your website comments that we received on 18 and 23 November 2010.
Recent performance
I am extremely sorry that your services have been disrupted recently. I understand that it is very frustrating when delays to a journey, large or small, occur frequently. I have no wish to make excuses, but it may be helpful to explain our current position. Further to this, I should explain that the rail network has encountered problems recently due to poor rail adhesion caused by leaves and ice. As our trains are powered by the electricity supply using a conductor rail, anything covering it, like leaves, ice or snow, acts as an insulating layer making it very difficult for trains to draw power.
I trust you will appreciate that when track conditions are poor, drivers must exercise more care and delays are inevitable. In icy conditions, de-icing trains operate across the network during the night. However, more ice may accumulate on the rails if weather conditions subsequently deteriorate, and this may result in trains being unable to pick up current from the conductor rail on certain vulnerable routes. Ice on the rails can also lead to electrical arcing, causing motors to burn out and trains to fail. Because of this, and because train crews are often displaced, numerous trains may consequently be delayed and cancelled. Although points at many locations have special heaters which melt ice and snow, they do not provide complete protection, and exceptional circumstances may cause them to fail.
In addition, when leaves fall on the railway lines in wet conditions, these quickly pulp down to form a slippery layer on the rails, similar to black ice on the roads. Whilst we make every effort to prevent these problems by cutting back foliage during the summer months and clearing leaves from the line, I'm sure you will realise that leaves are always a problem for us at this time of year. Unlike occasions when ice affects the rails, salt or deicer will not alleviate the problem, so unfortunately there is little we can do about this beyond cautioning drivers to drive more slowly.
However, I can assure you that it is our aim to operate a punctual service. In fact, there are financial penalties imposed upon us if our punctuality drops below target. Therefore, we are not complacent, and we know we have more to do to improve consistency through the busier parts of our network as they are still very vulnerable to widespread disruption being caused by minor events. This is one area we are focusing on over the next year. Our key challenges going forward are to deliver better punctuality and try and tackle the issues which have caused the most problems recently, such as the most frequent infrastructure problems and the technical faults which result in train failures. To improve the position, we are taking action in seeking better performance from Network Rail, who maintain the track and signalling.
We have an on-going maintenance programme for our trains and they are serviced regularly whether faults occur or not. Unfortunately, because we have a limited number of trains and no rolling stock is completely immune from breakdown, we will occasionally suffer technical faults on our trains, and occasionally we will need to take carriages out of service. What is important is that we reduce these incidents to the absolute minimum by ensuring that our maintenance and repair programme is of a very high standard.
We are also continuing to modify trains in order to make them more reliable. For example, this winter we are fitting trains with tanks of de-icing fluid to alleviate some of the problems that we have had in the past with the 'third rail' during icy conditions. Network Rail are working on plans to further improve the reliability of the track and signalling. Considering this, I do hope that you don’t encounter such difficulties too often. I also hope that you will accept my sincere apologies for any inconvenience that you have suffered.
Most people appreciate that there will inevitably be occasions when services are delayed. However we recognise that the absence of up to date information at such times, would just add insult to injury. Further to this, we do appreciate that up to date information is crucial during times of disruption and we aim to provide this through information displays, announcements, website information and also through our staff members at stations and on trains.
Our Customer Information Displays on platforms are updated automatically by trackside equipment. So, when a train passes a sensor on the tracks, the signs update accordingly. When a train is held up, the signs will not update until the train passes the next set of sensors. If a train is to be held for some time due to track problems, obstructions on the line, or similar, the signs must be updated manually. Obviously, this will not occur until the problem has been identified by the Control Centre.
You have mentioned compensation. Our Passenger’s Charter includes a promise to compensate for poor performance. This does not apply to monthly or longer Season Ticket holders when they are delayed on individual journeys. If our overall performance dips below our agreed franchise target, as set by the Department of Transport, then we will rightly give a discount when tickets are renewed. However, at this time our performance is above this target (this information can be found on the Passenger Charter section of our website) and discounts are not being given. However, you may wish to check the current performance when you renew your season ticket. The current performance figures for our network are as follows:
Mainline
Target Period Annual Threshold for
average average season ticket
discounts
Punctuality 85% 72.70% 83.10% 82%
Reliability 99% 96.70% 99% 98%
Major incidents None
Void days None
Once again, please accept my apologies for the problems that you have encountered during your journeys, and thank you for contacting Southeastern.
Yours sincerely
Southeastern
Email to Southeastern:
Dear Southeastern,
Thank you so much for your "winter train FAQ" it was a fascinating read, a little short on plot twists but generally very enjoyable, certainly better written then a Dan Brown novel even if it did require a similar level of disbelief to make it all the way to the end.
I would like to query one part of it though, as it mentioned that in cold weather ice forms on the conductor rail which effectively insulates it from the pickup shoe on the train, understandably making it quite difficult to draw current from the conductor rail.
Much like the leaves on the line issue this is not a new issue nor should it come as a surprise that sometimes in winter it gets cold.
So what I don't understand quite so easily is why this is still a problem? Electrification happened in what is now Southeasterns network around 1930 so what exactly have the train companies doing in the 80 years since this happened?
I look forward to your response.
Regards
Elliot
Dear Southeastern,
Re: London Bridge to Gravesend - sometime between 17:30 and 18:30
I'm pretty sure that being repeatedly kicked in the testicles is not only more fun than last night’s journey home but is also likely to have imparted more information than either the station staff or display boards managed, as all the boards showed "delayed" but no actual information on expected times or indeed what platforms we might expect them to arrive at.
Shutting Cannon Street (my normal station) was however a work of brilliance which I'm sure was a carefully calculated plan. To be honest I can't help but think that Southeastern are involved in some kind of physiological experiment to just how far you can push the human psychology. If not then I would like to put this forward to either your suggestion box or I might contact ITV with an outline for a show called "I'm a commuter, get me out of here"
So to recap:
1) Trains were running 40 minutes late
2) Trains were cancelled, although in the interest of full disclosure my train wasn't cancelled and amazingly wasn't cancelled at Dartford like normal
3) Station announcements amounted to "Everything is late; we're not sure what's arriving next."
Now it's been made clear from previous emails that you will not consider compensation because of your ridiculously skewed passenger charter and that the fact you are very sorry should be enough for me. So let's skip the formalities where I ask for something, you quote pages of your charter at me and I reject your kind offer of nothing at all; I would like you to consider the following: You may be aware that this month is Movember which is a charity event raising money for (in the UK) The Prostate Cancer Charity. Please would you consider making a donation to this worthwhile cause? You can donate via my page below.
http://uk.movember.com/donate/your-details/member_id/1256686/
Go on, give me a chance to tell people that Southeastern have done something good for once.
Thanks
Elliot
Southeastern reply: (but no donation!)
Dear Mr Uttridge
Thank you for your website comments that we received on 18 and 23 November 2010.
Recent performance
I am extremely sorry that your services have been disrupted recently. I understand that it is very frustrating when delays to a journey, large or small, occur frequently. I have no wish to make excuses, but it may be helpful to explain our current position. Further to this, I should explain that the rail network has encountered problems recently due to poor rail adhesion caused by leaves and ice. As our trains are powered by the electricity supply using a conductor rail, anything covering it, like leaves, ice or snow, acts as an insulating layer making it very difficult for trains to draw power.
I trust you will appreciate that when track conditions are poor, drivers must exercise more care and delays are inevitable. In icy conditions, de-icing trains operate across the network during the night. However, more ice may accumulate on the rails if weather conditions subsequently deteriorate, and this may result in trains being unable to pick up current from the conductor rail on certain vulnerable routes. Ice on the rails can also lead to electrical arcing, causing motors to burn out and trains to fail. Because of this, and because train crews are often displaced, numerous trains may consequently be delayed and cancelled. Although points at many locations have special heaters which melt ice and snow, they do not provide complete protection, and exceptional circumstances may cause them to fail.
In addition, when leaves fall on the railway lines in wet conditions, these quickly pulp down to form a slippery layer on the rails, similar to black ice on the roads. Whilst we make every effort to prevent these problems by cutting back foliage during the summer months and clearing leaves from the line, I'm sure you will realise that leaves are always a problem for us at this time of year. Unlike occasions when ice affects the rails, salt or deicer will not alleviate the problem, so unfortunately there is little we can do about this beyond cautioning drivers to drive more slowly.
However, I can assure you that it is our aim to operate a punctual service. In fact, there are financial penalties imposed upon us if our punctuality drops below target. Therefore, we are not complacent, and we know we have more to do to improve consistency through the busier parts of our network as they are still very vulnerable to widespread disruption being caused by minor events. This is one area we are focusing on over the next year. Our key challenges going forward are to deliver better punctuality and try and tackle the issues which have caused the most problems recently, such as the most frequent infrastructure problems and the technical faults which result in train failures. To improve the position, we are taking action in seeking better performance from Network Rail, who maintain the track and signalling.
We have an on-going maintenance programme for our trains and they are serviced regularly whether faults occur or not. Unfortunately, because we have a limited number of trains and no rolling stock is completely immune from breakdown, we will occasionally suffer technical faults on our trains, and occasionally we will need to take carriages out of service. What is important is that we reduce these incidents to the absolute minimum by ensuring that our maintenance and repair programme is of a very high standard.
We are also continuing to modify trains in order to make them more reliable. For example, this winter we are fitting trains with tanks of de-icing fluid to alleviate some of the problems that we have had in the past with the 'third rail' during icy conditions. Network Rail are working on plans to further improve the reliability of the track and signalling. Considering this, I do hope that you don’t encounter such difficulties too often. I also hope that you will accept my sincere apologies for any inconvenience that you have suffered.
Most people appreciate that there will inevitably be occasions when services are delayed. However we recognise that the absence of up to date information at such times, would just add insult to injury. Further to this, we do appreciate that up to date information is crucial during times of disruption and we aim to provide this through information displays, announcements, website information and also through our staff members at stations and on trains.
Our Customer Information Displays on platforms are updated automatically by trackside equipment. So, when a train passes a sensor on the tracks, the signs update accordingly. When a train is held up, the signs will not update until the train passes the next set of sensors. If a train is to be held for some time due to track problems, obstructions on the line, or similar, the signs must be updated manually. Obviously, this will not occur until the problem has been identified by the Control Centre.
You have mentioned compensation. Our Passenger’s Charter includes a promise to compensate for poor performance. This does not apply to monthly or longer Season Ticket holders when they are delayed on individual journeys. If our overall performance dips below our agreed franchise target, as set by the Department of Transport, then we will rightly give a discount when tickets are renewed. However, at this time our performance is above this target (this information can be found on the Passenger Charter section of our website) and discounts are not being given. However, you may wish to check the current performance when you renew your season ticket. The current performance figures for our network are as follows:
Mainline
Target Period Annual Threshold for
average average season ticket
discounts
Punctuality 85% 72.70% 83.10% 82%
Reliability 99% 96.70% 99% 98%
Major incidents None
Void days None
Once again, please accept my apologies for the problems that you have encountered during your journeys, and thank you for contacting Southeastern.
Yours sincerely
Southeastern
Email to Southeastern:
Dear Southeastern,
Thank you so much for your "winter train FAQ" it was a fascinating read, a little short on plot twists but generally very enjoyable, certainly better written then a Dan Brown novel even if it did require a similar level of disbelief to make it all the way to the end.
I would like to query one part of it though, as it mentioned that in cold weather ice forms on the conductor rail which effectively insulates it from the pickup shoe on the train, understandably making it quite difficult to draw current from the conductor rail.
Much like the leaves on the line issue this is not a new issue nor should it come as a surprise that sometimes in winter it gets cold.
So what I don't understand quite so easily is why this is still a problem? Electrification happened in what is now Southeasterns network around 1930 so what exactly have the train companies doing in the 80 years since this happened?
I look forward to your response.
Regards
Elliot
Thursday, 18 November 2010
18 November 2010
Email to Southeastern
Dear Southeastern,
As my monthly ticket expired yesterday (17/11/10) I decided to get a yearly ticket, even though this is a huge chunk of cash and I am by definition giving up all hope of ever getting any compensation from you for late running trains (Honestly 82%, you could stop running trains in to Victoria and still hit that!)
So imagine my delight when today upon using my shiny new gold card the train was only 14 minutes late in to London Cannon Street!
I can only hope that you intend to perform better over the coming months.
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 18 November.
I am sorry that you have experienced a number of problems on your recent journeys between Gravesend and London, and in the opposite direction. As a regular commuter, I can understand your frustration over the frequency of delays to your recent journeys, as the reliability of the train service on your line is not as good as we would like at present. As you may be aware, there have been a number of incidents that have affected performance on your line recently, some of which have been outside our control. It is clear that, when things go wrong on your line, our services are still vulnerable to disruption, particularly during the busy rush hours when we operate the majority of our services.
Our key challenges going forward are to deliver better punctuality and try and tackle the issues which have caused the most problems on your line over the past few months, such as the most frequent infrastructure problems and the technical faults which result in train failures. For their part, Network Rail are working on plans to further improve the reliability of the track and signalling. We are taking action, therefore, both in terms of train maintenance and in seeking better infrastructure performance from Network Rail, in order to achieve better performance results.
Once again, I am sorry for the delays that you have been experiencing. You rightly expect us to consistently provide a good quality train service on which you can rely, and we understand the frustration you feel when we cause you to be late. We realise that we have much work still to do to deliver consistently high levels of punctuality, day-in day-out, but I can assure you that there will be no let-up in our determination to deliver a better service for you on a more consistent basis.
Yours sincerely
Southeastern.
And then oddly the replied again on December 1st:
Dear Mr Uttridge
Thank you for your website comments that we received on 18 and 23 November 2010.
Recent performance
I am extremely sorry that your services have been disrupted recently. I understand that it is very frustrating when delays to a journey, large or small, occur frequently. I have no wish to make excuses, but it may be helpful to explain our current position. Further to this, I should explain that the rail network has encountered problems recently due to poor rail adhesion caused by leaves and ice. As our trains are powered by the electricity supply using a conductor rail, anything covering it, like leaves, ice or snow, acts as an insulating layer making it very difficult for trains to draw power.
I trust you will appreciate that when track conditions are poor, drivers must exercise more care and delays are inevitable. In icy conditions, de-icing trains operate across the network during the night. However, more ice may accumulate on the rails if weather conditions subsequently deteriorate, and this may result in trains being unable to pick up current from the conductor rail on certain vulnerable routes. Ice on the rails can also lead to electrical arcing, causing motors to burn out and trains to fail. Because of this, and because train crews are often displaced, numerous trains may consequently be delayed and cancelled. Although points at many locations have special heaters which melt ice and snow, they do not provide complete protection, and exceptional circumstances may cause them to fail.
In addition, when leaves fall on the railway lines in wet conditions, these quickly pulp down to form a slippery layer on the rails, similar to black ice on the roads. Whilst we make every effort to prevent these problems by cutting back foliage during the summer months and clearing leaves from the line, I'm sure you will realise that leaves are always a problem for us at this time of year. Unlike occasions when ice affects the rails, salt or deicer will not alleviate the problem, so unfortunately there is little we can do about this beyond cautioning drivers to drive more slowly.
However, I can assure you that it is our aim to operate a punctual service. In fact, there are financial penalties imposed upon us if our punctuality drops below target. Therefore, we are not complacent, and we know we have more to do to improve consistency through the busier parts of our network as they are still very vulnerable to widespread disruption being caused by minor events. This is one area we are focusing on over the next year. Our key challenges going forward are to deliver better punctuality and try and tackle the issues which have caused the most problems recently, such as the most frequent infrastructure problems and the technical faults which result in train failures. To improve the position, we are taking action in seeking better performance from Network Rail, who maintain the track and signalling.
We have an on-going maintenance programme for our trains and they are serviced regularly whether faults occur or not. Unfortunately, because we have a limited number of trains and no rolling stock is completely immune from breakdown, we will occasionally suffer technical faults on our trains, and occasionally we will need to take carriages out of service. What is important is that we reduce these incidents to the absolute minimum by ensuring that our maintenance and repair programme is of a very high standard.
We are also continuing to modify trains in order to make them more reliable. For example, this winter we are fitting trains with tanks of de-icing fluid to alleviate some of the problems that we have had in the past with the 'third rail' during icy conditions. Network Rail are working on plans to further improve the reliability of the track and signalling. Considering this, I do hope that you don’t encounter such difficulties too often. I also hope that you will accept my sincere apologies for any inconvenience that you have suffered.
Most people appreciate that there will inevitably be occasions when services are delayed. However we recognise that the absence of up to date information at such times, would just add insult to injury. Further to this, we do appreciate that up to date information is crucial during times of disruption and we aim to provide this through information displays, announcements, website information and also through our staff members at stations and on trains.
Our Customer Information Displays on platforms are updated automatically by trackside equipment. So, when a train passes a sensor on the tracks, the signs update accordingly. When a train is held up, the signs will not update until the train passes the next set of sensors. If a train is to be held for some time due to track problems, obstructions on the line, or similar, the signs must be updated manually. Obviously, this will not occur until the problem has been identified by the Control Centre.
You have mentioned compensation. Our Passenger’s Charter includes a promise to compensate for poor performance. This does not apply to monthly or longer Season Ticket holders when they are delayed on individual journeys. If our overall performance dips below our agreed franchise target, as set by the Department of Transport, then we will rightly give a discount when tickets are renewed. However, at this time our performance is above this target (this information can be found on the Passenger Charter section of our website) and discounts are not being given. However, you may wish to check the current performance when you renew your season ticket. The current performance figures for our network are as follows:
Mainline
Target Period Annual Threshold for
average average season ticket
discounts
Punctuality 85% 72.70% 83.10% 82%
Reliability 99% 96.70% 99% 98%
Major incidents None
Void days None
Once again, please accept my apologies for the problems that you have encountered during your journeys, and thank you for contacting Southeastern.
Yours sincerely
Southeastern
Email to Southeastern:
Dear Southeastern,
Thank you for forwarding me your "Winter Train problems FAQ" on
I understand that leaves on the line cause a huge problem for trains due to the frictionless Teflon style paste that they become once they have been crushed by the substantial weight of a train and that this lack of friction limits the traction available to the train resulting in longer starting and stopping distances.
What I don't understand is why this is still a problem. Steam trains are generally not affected by this issue due to the heating and blasting effect that the waste steam has on the rails and the last steam train ran on the British Rail network sometime in the late 1960's so you've had at least 40 years, I mean, it's not like autumn should come as a shock to us as it's been happening every year since at least 1979 (and probably much further back!).
I look forward to your response.
Regards
Elliot
Dear Southeastern,
As my monthly ticket expired yesterday (17/11/10) I decided to get a yearly ticket, even though this is a huge chunk of cash and I am by definition giving up all hope of ever getting any compensation from you for late running trains (Honestly 82%, you could stop running trains in to Victoria and still hit that!)
So imagine my delight when today upon using my shiny new gold card the train was only 14 minutes late in to London Cannon Street!
I can only hope that you intend to perform better over the coming months.
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 18 November.
I am sorry that you have experienced a number of problems on your recent journeys between Gravesend and London, and in the opposite direction. As a regular commuter, I can understand your frustration over the frequency of delays to your recent journeys, as the reliability of the train service on your line is not as good as we would like at present. As you may be aware, there have been a number of incidents that have affected performance on your line recently, some of which have been outside our control. It is clear that, when things go wrong on your line, our services are still vulnerable to disruption, particularly during the busy rush hours when we operate the majority of our services.
Our key challenges going forward are to deliver better punctuality and try and tackle the issues which have caused the most problems on your line over the past few months, such as the most frequent infrastructure problems and the technical faults which result in train failures. For their part, Network Rail are working on plans to further improve the reliability of the track and signalling. We are taking action, therefore, both in terms of train maintenance and in seeking better infrastructure performance from Network Rail, in order to achieve better performance results.
Once again, I am sorry for the delays that you have been experiencing. You rightly expect us to consistently provide a good quality train service on which you can rely, and we understand the frustration you feel when we cause you to be late. We realise that we have much work still to do to deliver consistently high levels of punctuality, day-in day-out, but I can assure you that there will be no let-up in our determination to deliver a better service for you on a more consistent basis.
Yours sincerely
Southeastern.
And then oddly the replied again on December 1st:
Dear Mr Uttridge
Thank you for your website comments that we received on 18 and 23 November 2010.
Recent performance
I am extremely sorry that your services have been disrupted recently. I understand that it is very frustrating when delays to a journey, large or small, occur frequently. I have no wish to make excuses, but it may be helpful to explain our current position. Further to this, I should explain that the rail network has encountered problems recently due to poor rail adhesion caused by leaves and ice. As our trains are powered by the electricity supply using a conductor rail, anything covering it, like leaves, ice or snow, acts as an insulating layer making it very difficult for trains to draw power.
I trust you will appreciate that when track conditions are poor, drivers must exercise more care and delays are inevitable. In icy conditions, de-icing trains operate across the network during the night. However, more ice may accumulate on the rails if weather conditions subsequently deteriorate, and this may result in trains being unable to pick up current from the conductor rail on certain vulnerable routes. Ice on the rails can also lead to electrical arcing, causing motors to burn out and trains to fail. Because of this, and because train crews are often displaced, numerous trains may consequently be delayed and cancelled. Although points at many locations have special heaters which melt ice and snow, they do not provide complete protection, and exceptional circumstances may cause them to fail.
In addition, when leaves fall on the railway lines in wet conditions, these quickly pulp down to form a slippery layer on the rails, similar to black ice on the roads. Whilst we make every effort to prevent these problems by cutting back foliage during the summer months and clearing leaves from the line, I'm sure you will realise that leaves are always a problem for us at this time of year. Unlike occasions when ice affects the rails, salt or deicer will not alleviate the problem, so unfortunately there is little we can do about this beyond cautioning drivers to drive more slowly.
However, I can assure you that it is our aim to operate a punctual service. In fact, there are financial penalties imposed upon us if our punctuality drops below target. Therefore, we are not complacent, and we know we have more to do to improve consistency through the busier parts of our network as they are still very vulnerable to widespread disruption being caused by minor events. This is one area we are focusing on over the next year. Our key challenges going forward are to deliver better punctuality and try and tackle the issues which have caused the most problems recently, such as the most frequent infrastructure problems and the technical faults which result in train failures. To improve the position, we are taking action in seeking better performance from Network Rail, who maintain the track and signalling.
We have an on-going maintenance programme for our trains and they are serviced regularly whether faults occur or not. Unfortunately, because we have a limited number of trains and no rolling stock is completely immune from breakdown, we will occasionally suffer technical faults on our trains, and occasionally we will need to take carriages out of service. What is important is that we reduce these incidents to the absolute minimum by ensuring that our maintenance and repair programme is of a very high standard.
We are also continuing to modify trains in order to make them more reliable. For example, this winter we are fitting trains with tanks of de-icing fluid to alleviate some of the problems that we have had in the past with the 'third rail' during icy conditions. Network Rail are working on plans to further improve the reliability of the track and signalling. Considering this, I do hope that you don’t encounter such difficulties too often. I also hope that you will accept my sincere apologies for any inconvenience that you have suffered.
Most people appreciate that there will inevitably be occasions when services are delayed. However we recognise that the absence of up to date information at such times, would just add insult to injury. Further to this, we do appreciate that up to date information is crucial during times of disruption and we aim to provide this through information displays, announcements, website information and also through our staff members at stations and on trains.
Our Customer Information Displays on platforms are updated automatically by trackside equipment. So, when a train passes a sensor on the tracks, the signs update accordingly. When a train is held up, the signs will not update until the train passes the next set of sensors. If a train is to be held for some time due to track problems, obstructions on the line, or similar, the signs must be updated manually. Obviously, this will not occur until the problem has been identified by the Control Centre.
You have mentioned compensation. Our Passenger’s Charter includes a promise to compensate for poor performance. This does not apply to monthly or longer Season Ticket holders when they are delayed on individual journeys. If our overall performance dips below our agreed franchise target, as set by the Department of Transport, then we will rightly give a discount when tickets are renewed. However, at this time our performance is above this target (this information can be found on the Passenger Charter section of our website) and discounts are not being given. However, you may wish to check the current performance when you renew your season ticket. The current performance figures for our network are as follows:
Mainline
Target Period Annual Threshold for
average average season ticket
discounts
Punctuality 85% 72.70% 83.10% 82%
Reliability 99% 96.70% 99% 98%
Major incidents None
Void days None
Once again, please accept my apologies for the problems that you have encountered during your journeys, and thank you for contacting Southeastern.
Yours sincerely
Southeastern
Email to Southeastern:
Dear Southeastern,
Thank you for forwarding me your "Winter Train problems FAQ" on
I understand that leaves on the line cause a huge problem for trains due to the frictionless Teflon style paste that they become once they have been crushed by the substantial weight of a train and that this lack of friction limits the traction available to the train resulting in longer starting and stopping distances.
What I don't understand is why this is still a problem. Steam trains are generally not affected by this issue due to the heating and blasting effect that the waste steam has on the rails and the last steam train ran on the British Rail network sometime in the late 1960's so you've had at least 40 years, I mean, it's not like autumn should come as a shock to us as it's been happening every year since at least 1979 (and probably much further back!).
I look forward to your response.
Regards
Elliot
Tuesday, 16 November 2010
16 November 2010
Email to Southeastern:
Dear Southeastern,
I hope that you managed to get to work on time today, if you did then I very much doubt that you came on a train provided by Southeastern.
Tuesday 16th November for me was a rather important day as it was annual review time and although a review would be unfair if it was only based on one day, I can't help thinking that being late for work was really the best start. In this case I am using the English language version of the word late rather than the Southeastern definition of "well, it wasn't more than 5 minutes so be thankful that you got there at all". In fact I was late enough to have to call in and explain that I wouldn't be there on time which, as I'm sure you can image came as a great shock to them as I am normally at my desk at least 15 minutes before I am due to start.
The train in question was the 07:32 Gravesend to London Cannon Street service
Please can you:
1) explain why the train was late using rhyming couplets
2) provide a short letter that I may forward to my manager.
Thanks
Elliot
Dear Southeastern,
I hope that you managed to get to work on time today, if you did then I very much doubt that you came on a train provided by Southeastern.
Tuesday 16th November for me was a rather important day as it was annual review time and although a review would be unfair if it was only based on one day, I can't help thinking that being late for work was really the best start. In this case I am using the English language version of the word late rather than the Southeastern definition of "well, it wasn't more than 5 minutes so be thankful that you got there at all". In fact I was late enough to have to call in and explain that I wouldn't be there on time which, as I'm sure you can image came as a great shock to them as I am normally at my desk at least 15 minutes before I am due to start.
The train in question was the 07:32 Gravesend to London Cannon Street service
Please can you:
1) explain why the train was late using rhyming couplets
2) provide a short letter that I may forward to my manager.
Thanks
Elliot
15 November 2010
Email to Southeastern
Dear Southeastern,
Between the dates of Monday 8th November and Friday 12th November (inclusive) I used your 07:32 Gravesend to London Cannon Street service five times and your London Cannon Street to Gravesend 17:50 service four times (one time I used the still rather excellent although hideously expensive HS1 from St. Pancreas to Gravesend) out of the 9 times that I used the normal service 7 of these were late and on one occasion (London Cannon Street to Gravesend) not only was the train a couple of minutes late but also a couple of carriages short too.
As you would expect it goes without saying that information about the cause and/or reason for these delays was none existent and the wonderfully inaccurate email service managed to advise me of none of these issues ahead of time.
Unfortunately because this works out at a 37% on schedule rate for me I am going to have to give you an F-.
Please try harder this week.
Elliot
Dear Southeastern,
Between the dates of Monday 8th November and Friday 12th November (inclusive) I used your 07:32 Gravesend to London Cannon Street service five times and your London Cannon Street to Gravesend 17:50 service four times (one time I used the still rather excellent although hideously expensive HS1 from St. Pancreas to Gravesend) out of the 9 times that I used the normal service 7 of these were late and on one occasion (London Cannon Street to Gravesend) not only was the train a couple of minutes late but also a couple of carriages short too.
As you would expect it goes without saying that information about the cause and/or reason for these delays was none existent and the wonderfully inaccurate email service managed to advise me of none of these issues ahead of time.
Unfortunately because this works out at a 37% on schedule rate for me I am going to have to give you an F-.
Please try harder this week.
Elliot
Wednesday, 3 November 2010
3 November 2010
Email to Southeastern
Dear Southeastern,
I hope that you are well on this rather cold and frosty morning.
My train today was late pretty much from the time I got on it this morning, including 6 minutes by the time we got to Dartford and finally 14 minutes late getting to London Bridge and 14 minutes late to Cannon Street. Would you be able to
1) investigate the cause of this delay?
2) Can you also tell me if this counts as two late trains in to London (as it was late at London Bridge and to Cannon Street) or just one as only the final destination of the train is counted?
Furthermore I would like to bring to your attention the lack of attractive women on this morning’s train, you would have thought that given that there were 8000 people crammed in to one carriage, that there would have been at least one to make the journey slightly more bearable.
I would suggest that Southeastern look in to this as a matter of priority, now obviously I realise that you would be unable to assign customers to carriage based on their looks so maybe you could hire some attractive women (and I guess in the interest of fairness and non-sexism, some attractive men too but to be honest if the women want that then they can write their own letter) to wander the trains.
Maybe you could use some of the enormous fare rise that you will no doubt force upon us now that the government have decided to relax the fare rise caps, to pay for this.
I look forward to your response.
Regards
Elliot
Southeastern reply: (Probably the best reply ever!)
Dear Mr Uttridge
Thank you for your website comment that we received on 21 October 2010.
Re: Service from Gravesend to Cannon Street on 21 October
I am well, and thank you for asking. I also hope that this letter finds you in good spirits. With regard to the points you have raised, I am sorry that your train was delayed by 14 minutes on 21 October. Unfortunately, I am unable to clarify why this was, as you have not mentioned which train you were using. However, I can confirm that there were a number of problems affecting services that day. Details about this can be found on our website at the following location: http://www.southeasternrailway.co.uk/your-journey/daily-performance/october-archive/360/
I am also sorry that there were not enough attractive women on your train. I'm sure you will recognise that it is difficult to provide services that suit each passenger individually. This is partly because beauty is in the eye of the beholder, but also because we cannot discriminate against those passengers that do not meet your set criteria.
We operate a turn-up-and-go service, which means that anyone can buy a ticket and attempt to board a train, no matter how attractive. Nevertheless, if you are able to ask a few of your attractive female friends to join you on your journey then this would not only help to boost our revenue, but would also help to ensure that your request for the provision of attractive women is suitably catered for. I am sorry that I am unable to assist you any further in this regard.
All the same, I thank you once more for contacting us. You rightly expect us to consistently provide a high quality train service on which you can rely, and we understand the frustration you feel when we cause you to be late. We realise that we have much work still to do to deliver consistently high levels of punctuality, day-in day-out, but I can assure you that there will be no let-up in our determination to deliver a better service for you on a more consistent basis.
Yours sincerely
Southeastern
Wednesday, 29 September 2010
29 September 2010
Email to SouthEastern:
Dear SouthEastern
It seems like only yesterday that I was flirting with you, sending whimsical emails to you accusing you of stealing my weekend but now I find myself emailing you once again from a stand point of furious rage and anger for you see, once again, you have managed to completely ruin my evening. The story starts with the following email sent by your disinformation service yesterday.
> Date: Tue, 28 Sep 2010 17:15:01 +0100
> Subject: No known disruption: London Cannon Street to Gravesend
>
> Dear Elliot Uttridge,
>
> There are no disruptions reported at this time affecting services between your selected
> stations London Cannon Street to Gravesend.
Now whilst at first glance this seems perfectly reasonable I would like to point out the following oversights:
Firstly Cannon Street Station was closed. Now I’ll admit that Cannon Street is not between Cannon Street and Gravesend but I put it to you that it’s pretty hard to start your journey from a station that you can’t get in to. This resulted in me (and several thousand others) hiking over to London Bridge in an attempt to get a train heading at least in the sort of direction that I wanted to go.
Secondly there had been signalling issues around the Lewisham since around 17:00 which as you can see is defiantly before the email was sent to me. In an amusing turn if the email had contained the correct information I would have travelled to St. Pancreas and used the rather excellent High Speed 1 service, which I would have had to actually pay extra for, in affect making you more money but as it is I didn’t so I’m here complaining to you.
Once we had finally managed to get a train heading in the Gravesend direction (a mere 25 minutes late) we then had the fun of the train suddenly and without warning being cancelled at Dartford. This seems to be Southeaster’s standard response to late running trains (see previous correspondence on 27 July and 15 June) and despite your earlier claim that this is for the benefit of customers (although not the ones that are chucked out on to Dartford station platform with no information obviously) I can only think that this is actually some kind of experiment to see just what stress levels the human body is actually capable of withstanding.
When the next train to Gravesend arrives we then discover that it’s a slow train stopping everywhere, this added yet more time to my already length journey home.
I’m sure that you think that I complain about ever single trip that I take with SouthEastern but I can assure that you I do only contact you when the service is really bad rather than any time that the service is late (which is frequently, despite what your statistics may claim).
They only good thing to say about this entire trip was the station staff at Dartford who also had no clue about what was going on but didn’t let it affect they professionalism with the customers. Probably the best bit was when the train arrived that they weren’t expecting.
What I would like, well what I would really like is backstage passes to a Queen concert but as Freddie Mercury has been dead for 19 years and John Deacon is a recluse it’s probably better if I stick to something that you might actually be able to deliver. So with that in mind I will settle for a weekend break in a health spa somewhere in Kent in either November or December for myself and my rather distressed wife (who was disappointed that her hard work in the kitchen now had the same colour and appeal as the burnt out Astra at the end of the street).
I look forward to hearing your response on this.
Regards
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 29 September.
I am sorry that your journey from London Cannon Street to Gravesend was badly disrupted on the evening of 28 September. This was a result of points and signalling problems in the Lewisham area.
We were first alerted to problems at 16:31, when the Signal Manager for the area discovered that the signals could not be set for some of the tracks. This was immediately reported to our control centre, who arranged for Network Rail engineers to investigate what had happened. In addition to this, the control centre notified passengers about signalling problems on the line at 16:48. When it became clear that the problem would take some time to resolve, we arranged for tickets to be accepted on local bus services to assist stranded passengers. We were able to finalise agreements with local bus companies at 17:15 and attempted to notify all affected passengers. Engineers discovered that the problem was caused by leaking hydraulic fluid adjacent to the points, which prevented the points and signals from operating correctly.
Once the problem had been identified, the engineers cleared the hydraulic fluid, replaced the fluid container, and then attempted to reset the points and signals. However, this took some time and additional work was required to get them back up and running. We were notified at 19:35 that the problem had been rectified and we were then able to recover the delayed services. Again, this took some time, as trains and staff were in the wrong positions, but we made every effort to ensure that services returned back to normal as quickly as possible.
This occurred at the start of the evening peak period, causing prolonged and widespread disruption. Because the service recovery was complex, fast changing, and reliant on decisions made on a minute by minute basis by our operations centre staff, there were a number of changes made to the usual stopping patterns of some services, and some trains were taken out of service before they had reached their scheduled destination.
Obviously, this does not excuse the fact that we failed to tell you about the position, particularly that there were crowd control issues at Cannon Street station. We have experienced some problems in this area recently, and we are working hard to resolve these as soon as possible. At the same time, we are confident that the alerts are now much better than they used to be – more frequent, more than one journey, choose times you want to be alerted, etc. I am sorry that we let you down on this occasion but I can assure you that we are looking at how we can speed up the process.
As with most other service disruptions, our usual Passenger's Charter compensation arrangements apply. For period season ticket holders, this means that compensation may be available in the form of a discount when season tickets are renewed, and will apply if we have failed to achieve set performance targets, as per our franchise agreement with the Department for Transport. I regret to advise that we are unable to offer compensation over and above our Charter arrangements.
Once again, I am sorry for the problems that you experienced.
Yours sincerely
Dear SouthEastern,
Ref: 438121 / 202830
Please accept my apologies for the delay in responding to your email, I am sorry for the disruption that this will have caused to your day.
I am afraid that I am going to have to reject your kind offer of absolutely nothing and express again my displeasure at the service that I received on the afore mentioned journey. To be honest I think I'd have been less upset if you had told me to "Go stick my head in a pig" then pointing me to your shockingly biased Passenger's Charter.
Whilst I understand that incidents and issues happen that you have no control over and that issue can sometime be complex, I don't feel that this excuses the lack of information either given to passengers. Can you please explain exactly what you are planning to do to improve the speed and quality of information that you provide, not only to your customers but to your station staff too.
I look forward to reading your response to this.
Regards
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 19 October.
I am sorry that you are unhappy with our arrangements for compensating season ticket holders for poor performance. We realise that a greater level of compensation is always desirable from a passenger's point of view (and, of course, any compensation is dependent upon a season ticket being renewed). While there are no means by which train companies can be compelled to change their compensation arrangements during the lifetime of their franchise, and there is also nothing to require the companies to offer better terms than those which existed in the past, we will review the arrangements each year. However, the season ticket discount scheme has provided compensation for many thousands of season ticket holders down the years. While it is not perfect, we still feel it is the fairest way of compensating season ticket holders for poor performance.
On a separate issue, we realise that how we communicate with our passengers is still one of the biggest areas of dissatisfaction, and it is an area where there is considerable scope for improvement. To improve the position, we are working hard on improving the stability and reliability of our station information systems, and on making sure our staff are trained and able to exploit its capabilities effectively. We are also looking at ways of improving the flow of information to stations regarding train running and service alterations, and how we can improve the way in which we get information across to drivers and conductors, which can then be announced to passengers.
Once again, thank you for contacting us.
Yours sincerely
Monday, 27 September 2010
27 September 2010
Email to Southeastern
Dear SouthEastern,
On Friday I travelled home on the 17:50 Cannon Street to Gravesend service, then on Monday I used the 07:32 Gravesend to Cannon Street service and I can't help but notice that these times seemed much closer together this weekend then it has on most of the other weekends I have had.
I remember when I was younger and Philip Scohfield's hair was really black, summers lasted for 10 weeks, Wimbledon was on for all of spring and wagon wheels were the size of CD's (not that we knew what CD's were but Wagon Wheels were the size of audio cassettes really doesn't have the same feel to it).
Have SouthEastern changed the nature of time to increase their profits? Is there a form that I can use to claim back these lost hours?
Thanks
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 24 September.
I can appreciate your frustration about the re-scheduling of services at weekends, and I think it is fair to say that there are many passengers who feel the same way. However, I am sure you will understand that, in order to maintain high standards of track and signal safety, Network Rail (who own and maintain the railway infrastructure) regularly needs to carry out maintenance and repairs. Although routine work is carried out at night, major work needs to be done when there are the fewest numbers of passengers: unfortunately, this means weekends, although there are a few times when night time engineering can affect late night and early morning services. We sometimes have to revise train timetables or divert trains along different routes, but we also often have to hire buses to replace trains for part or all of the journey. Because buses are slower than the trains they replace, we have to introduce modified timetables, resulting in journey times being lengthened.
As with other train operators, we have little option but to work around engineering work as best as we can, although we recognise that it can be a real nuisance to passengers, who have extended journeys as a result. The arrangements are carefully planned and, in theory, should work comfortably. We have to admit though that connecting trains and buses can run late, and we may be unable to hold the connecting service. Occasionally, too, there is inadequate supervision by our staff to ensure a smooth transition from bus to train, or vice-versa. When we receive complaints about any aspect of a journey where there have been shortcomings in the way we have handled the arrangements, we record these concerns on our database for the attention of the relevant managers; they will take steps to try to ensure that the problems do not recur.
Once again, thank you for contacting us.
Yours sincerely
Email to Southeastern:
Dear SouthEastern
Thank you for your quick response on this however it didn't actually answer the question that I asked. Please can you deal with this as soon as possible.
Thanks
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 11 October. I am sorry that you are unhappy with the way in which I answered your recent complaint. As a company, we take great pride in the high level of service and passenger care we provide, and I do assure you that we always try to resolve complaints as efficiently as possible. The last thing that we want is for anybody to feel that their concerns have not been properly listened to.
Having had this opportunity to review the position, it appears that I misinterpreted what you were saying, particularly in your opening paragraph. I presumed - wrongly, as it turned out - that you were complaining about the re-scheduling of your services at the weekend. No discourtesy is intended, but I have run this by my colleagues' and we not sure about the nature of your complaint. If you would kindly clarify the position for me, I will be pleased to investigate the position for you.
I am sorry that you have needed to get back to us about this, but I hope that you will understand our position where this matter is concerned.
Yours sincerely
Southeastern
Honestly, they have no sense of humour...
Dear SouthEastern,
On Friday I travelled home on the 17:50 Cannon Street to Gravesend service, then on Monday I used the 07:32 Gravesend to Cannon Street service and I can't help but notice that these times seemed much closer together this weekend then it has on most of the other weekends I have had.
I remember when I was younger and Philip Scohfield's hair was really black, summers lasted for 10 weeks, Wimbledon was on for all of spring and wagon wheels were the size of CD's (not that we knew what CD's were but Wagon Wheels were the size of audio cassettes really doesn't have the same feel to it).
Have SouthEastern changed the nature of time to increase their profits? Is there a form that I can use to claim back these lost hours?
Thanks
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 24 September.
I can appreciate your frustration about the re-scheduling of services at weekends, and I think it is fair to say that there are many passengers who feel the same way. However, I am sure you will understand that, in order to maintain high standards of track and signal safety, Network Rail (who own and maintain the railway infrastructure) regularly needs to carry out maintenance and repairs. Although routine work is carried out at night, major work needs to be done when there are the fewest numbers of passengers: unfortunately, this means weekends, although there are a few times when night time engineering can affect late night and early morning services. We sometimes have to revise train timetables or divert trains along different routes, but we also often have to hire buses to replace trains for part or all of the journey. Because buses are slower than the trains they replace, we have to introduce modified timetables, resulting in journey times being lengthened.
As with other train operators, we have little option but to work around engineering work as best as we can, although we recognise that it can be a real nuisance to passengers, who have extended journeys as a result. The arrangements are carefully planned and, in theory, should work comfortably. We have to admit though that connecting trains and buses can run late, and we may be unable to hold the connecting service. Occasionally, too, there is inadequate supervision by our staff to ensure a smooth transition from bus to train, or vice-versa. When we receive complaints about any aspect of a journey where there have been shortcomings in the way we have handled the arrangements, we record these concerns on our database for the attention of the relevant managers; they will take steps to try to ensure that the problems do not recur.
Once again, thank you for contacting us.
Yours sincerely
Dear SouthEastern
Thank you for your quick response on this however it didn't actually answer the question that I asked. Please can you deal with this as soon as possible.
Thanks
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 11 October. I am sorry that you are unhappy with the way in which I answered your recent complaint. As a company, we take great pride in the high level of service and passenger care we provide, and I do assure you that we always try to resolve complaints as efficiently as possible. The last thing that we want is for anybody to feel that their concerns have not been properly listened to.
Having had this opportunity to review the position, it appears that I misinterpreted what you were saying, particularly in your opening paragraph. I presumed - wrongly, as it turned out - that you were complaining about the re-scheduling of your services at the weekend. No discourtesy is intended, but I have run this by my colleagues' and we not sure about the nature of your complaint. If you would kindly clarify the position for me, I will be pleased to investigate the position for you.
I am sorry that you have needed to get back to us about this, but I hope that you will understand our position where this matter is concerned.
Yours sincerely
Southeastern
Honestly, they have no sense of humour...
Sunday, 27 June 2010
27 June 2010
Email to Southeastern:
Dear SouthEastern,
I hope that this email find you well, unfortunately I am not feeling so great after last nights trip home.
Monday 26th journey from London Cannon Street to Gravesend
Whilst waiting for the 17:52 Cannon Street to Gravesend the display boards suddenly changed to show the next train (a Ramsgate service) when questioned the station staff assured us that this was a mistake and the next train was in fact the Gravesend train. However once the train arrived some of the more observant passengers noticed that this was not the normal type of train that we get (it was clean and had seats that were comfortable for a start). On questioning the station staff again we were assured that this was correct. 2 minutes late we are told that actually this is the Ramsgate train and the train we are actually wanting is starting for London Bridge but not actually giving us enough time to make it to London Bridge to get said train.
So now we have to wait for the 18:12 service from Cannon Street to Gillingham (which is the next train that calls at Gravesend, my destination). Everything is going well until we are just outside of Dartford when the driver announces that he's just been informed that this train will no longer be calling at Gravesend and will be fast to Strood after Dartford. So at Dartford we all disembark to wonder just how much worse tonight’s train journey could get. As it turned out the worst had indeed been saved for last, overhearing a passenger talking to one of the station staff at Dartford (who happens to be called Derek, this is important for later) we learned that the reason that the train had been made fast to Dartford was "because it was late" and that there was "nothing you can do about it just wait for the next one, it's only 2 minutes away". The next train was indeed 2 minutes away (So a plus point for that) but was a slow train to Gravesend calling at every station (minus several million points for that).
When we boarded this new (new as in "we'd not been on it before" rather then new as in "this train wasn't in service last time Haley’s comet came by") train we discovered that the heaters were on. The passenger that had previously been speaking to the station staff member at Dartford did inform him that the heating was on, to which the answer was a laugh and a comment to his college of "Can you believe this?" When asked by the passenger if he though that this was funny Derek decided that the best answer would be to tell the passenger "I think it's hilarious" as the train pulled away.
The end result was that I got home 50 minutes later then expected. Thanks.
Now I realize that this is a fairly long email as I've tried to cover everything that happened in that one trip home so I'll summarize exactly what I want to be taken from this email.
1) I uphold my end of this contract. I pay my money each month for a ticket, I don't put my feet on the chairs, and I don't hold the doors open or try to board trains that are getting ready to leave the station. However the only person that I get consistently good service from is Daniel who works in your contact centre when I complain! The "Passenger Charter" is so skewed in your favours that it would take a miracle of poor management for you to actually be able to miss your target. This is unfair and I look forward to hearing what you intend to do about this.
2) Derek at Dartford is a shocking example of customer service. Having worked in various customer service roles I am more then happy to agree that the customer is not always right, in fact the customer is some times a moron, however the customer is always the customer. I wouldn't have cared quite as much if he'd said "There is nothing I can do about" or "I'll see what I can do" and then left it but too actually comment about a customer while the customer can hear shows a shocking lack of respect. Hopefully someone will have a word with him about the importance of being nice to customers or at least faking empathy towards them.
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 27 July.
I am very sorry you had such a difficult and frustrating journey on the evening of Monday 26 July. The disruption was caused by signalling problems in the London area. This occurred at the height of the evening peak period and severely disrupted services. As a result, we had to start the train that you had intended to catch from London Bridge instead of Cannon Street, and alterations were made to the stopping patterns of some services.
While the cause of the disruption was outside our control, this does not minimise our responsibility to do the best we could in the circumstances, and I am sorry for the poor customer service that you received at Dartford station. This is something that we will follow up with the member of staff in question, and I will also ask our fleet maintenance team to investigate why the heating was on. Please accept my apologies for both aspects. I should explain, however, that the general principle in taking a decision to skip a station stop is to minimise overall delay, whilst considering what can be done to mitigate the impact on those adversely affected. It is never a decision that is taken lightly and, from a measurement point of view, any missed station counts as a cancellation, so it is subject to very close review. Of course, this policy is open to discussion as to whether it is right or wrong, but our approach tends to be biased towards restoring the timetable as quickly as possible (though the key issue is to address the root cause i.e. the late start/delay en route which makes such a decision an option).
Thank you for contacting us and, once again, please accept my apologies for what was clearly a very frustrating and annoying experience for you and many other passengers.
Yours sincerely
I hope that this email find you well, unfortunately I am not feeling so great after last nights trip home.
Monday 26th journey from London Cannon Street to Gravesend
Whilst waiting for the 17:52 Cannon Street to Gravesend the display boards suddenly changed to show the next train (a Ramsgate service) when questioned the station staff assured us that this was a mistake and the next train was in fact the Gravesend train. However once the train arrived some of the more observant passengers noticed that this was not the normal type of train that we get (it was clean and had seats that were comfortable for a start). On questioning the station staff again we were assured that this was correct. 2 minutes late we are told that actually this is the Ramsgate train and the train we are actually wanting is starting for London Bridge but not actually giving us enough time to make it to London Bridge to get said train.
So now we have to wait for the 18:12 service from Cannon Street to Gillingham (which is the next train that calls at Gravesend, my destination). Everything is going well until we are just outside of Dartford when the driver announces that he's just been informed that this train will no longer be calling at Gravesend and will be fast to Strood after Dartford. So at Dartford we all disembark to wonder just how much worse tonight’s train journey could get. As it turned out the worst had indeed been saved for last, overhearing a passenger talking to one of the station staff at Dartford (who happens to be called Derek, this is important for later) we learned that the reason that the train had been made fast to Dartford was "because it was late" and that there was "nothing you can do about it just wait for the next one, it's only 2 minutes away". The next train was indeed 2 minutes away (So a plus point for that) but was a slow train to Gravesend calling at every station (minus several million points for that).
When we boarded this new (new as in "we'd not been on it before" rather then new as in "this train wasn't in service last time Haley’s comet came by") train we discovered that the heaters were on. The passenger that had previously been speaking to the station staff member at Dartford did inform him that the heating was on, to which the answer was a laugh and a comment to his college of "Can you believe this?" When asked by the passenger if he though that this was funny Derek decided that the best answer would be to tell the passenger "I think it's hilarious" as the train pulled away.
The end result was that I got home 50 minutes later then expected. Thanks.
Now I realize that this is a fairly long email as I've tried to cover everything that happened in that one trip home so I'll summarize exactly what I want to be taken from this email.
1) I uphold my end of this contract. I pay my money each month for a ticket, I don't put my feet on the chairs, and I don't hold the doors open or try to board trains that are getting ready to leave the station. However the only person that I get consistently good service from is Daniel who works in your contact centre when I complain! The "Passenger Charter" is so skewed in your favours that it would take a miracle of poor management for you to actually be able to miss your target. This is unfair and I look forward to hearing what you intend to do about this.
2) Derek at Dartford is a shocking example of customer service. Having worked in various customer service roles I am more then happy to agree that the customer is not always right, in fact the customer is some times a moron, however the customer is always the customer. I wouldn't have cared quite as much if he'd said "There is nothing I can do about" or "I'll see what I can do" and then left it but too actually comment about a customer while the customer can hear shows a shocking lack of respect. Hopefully someone will have a word with him about the importance of being nice to customers or at least faking empathy towards them.
Southeastern reply:
Dear Mr Uttridge
Thank you for your email of 27 July.
I am very sorry you had such a difficult and frustrating journey on the evening of Monday 26 July. The disruption was caused by signalling problems in the London area. This occurred at the height of the evening peak period and severely disrupted services. As a result, we had to start the train that you had intended to catch from London Bridge instead of Cannon Street, and alterations were made to the stopping patterns of some services.
While the cause of the disruption was outside our control, this does not minimise our responsibility to do the best we could in the circumstances, and I am sorry for the poor customer service that you received at Dartford station. This is something that we will follow up with the member of staff in question, and I will also ask our fleet maintenance team to investigate why the heating was on. Please accept my apologies for both aspects. I should explain, however, that the general principle in taking a decision to skip a station stop is to minimise overall delay, whilst considering what can be done to mitigate the impact on those adversely affected. It is never a decision that is taken lightly and, from a measurement point of view, any missed station counts as a cancellation, so it is subject to very close review. Of course, this policy is open to discussion as to whether it is right or wrong, but our approach tends to be biased towards restoring the timetable as quickly as possible (though the key issue is to address the root cause i.e. the late start/delay en route which makes such a decision an option).
Thank you for contacting us and, once again, please accept my apologies for what was clearly a very frustrating and annoying experience for you and many other passengers.
Yours sincerely
Tuesday, 15 June 2010
15 June 2010
Email to Southeastern:
Hi there,
Please see below for the email that was sent to me yesterday afternoon. However upon my arrival at Cannon Street I discovered that all trains were subject to delays as there had been a signalling fault between London Bridge and Lewisham some time in the early afternoon.
Would you be able to provide any reason that this is a wonderful work of fiction (that to be honest rivals Dan Brown in terms of historical accuracy) was sent out?
> Date: Mon, 14 Jun 2010 15:45:04 +0100
> From: noreply@nexusalpha.com
> To: Elliot Uttridge
> Subject: No known disruption: London Cannon Street to Gravesend
>
> Dear Elliot Uttridge,
>
> There are no disruptions reported at this time affecting services between your selected stations London Cannon Street to Gravesend.
>
> For the latest live train running updates please see http://www.southeasternrailway.co.uk/live-running-information
>
> To change your settings, suspend your alerts, or to unsubscribe from the Southeastern Alerting Service, please log in to
> your user account at http://www.journeycheck.com/southeastern/login
Thanks
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comment that we received on 15 June 2010.
Information problems
I am very sorry to learn about the difficulties that you encountered on 14 June whilst travelling with Southeastern. I understand that this stems from incorrect service information that we sent to you in an email. I am sorry that you were not given the correct advice. I also apologise for the inconvenience that resulted.
It may be useful to explain how we update our train running information. The information that we are able to provide is always a reflection of the current service, but details are always a little behind things actually taking place on the network. The train running information we send out by email (and provide on our website) is updated by employees in our Control Centre. This is the same team that makes decisions about how the service operates, so in times of disruption will choose which services are to be cancelled, diverted, and so on, in an effort to 'recover' the service. So as soon as a decision is made it can be published on websites and sent out in emails.
As you’d expect we always set out to run a good service and work with Network Rail overnight to try to ensure the infrastructure is able to support the service we operate. This means that first thing in the morning, information systems will show the day’s timetable information and not give an indication that there may be potential problems to come. Unfortunately it's only when things go wrong that we're able to update the information and note the subsequent problems of cancelled and delayed service that will follow. We try to keep email information as up to date as possible and, where possible, provide information about the average length of delays. That said we'll still only be able to say there's disruption on a particular line after the problems have already started.
When disruptions occur, we do expect our staff to make announcements to keep passengers informed of the situation. But there can be occasions when they may be awaiting information themselves from either our Operations Centre or Network Rail (the company that owns and maintains the rail infrastructure). All the same, we should keep passengers informed, or at least offer an apology when we are awaiting information. Although I’m hopeful that they’ll do their best under what can often be difficult circumstances, I’m sorry for the problems that you experienced and for any difficulties that this caused you.
I sincerely apologise for these problems, and hope you do not encounter similar difficulties again. Nevertheless, I regret to say that such information problems are inevitable during severe weather conditions, and is a problem that all train operating companies face. I'm sure you will understand this when you consider that there are over 400,000 passengers that use our services each day, and many will need to find out about changes to scheduled services at times of disruption.
Yours sincerely
Hi there,
Please see below for the email that was sent to me yesterday afternoon. However upon my arrival at Cannon Street I discovered that all trains were subject to delays as there had been a signalling fault between London Bridge and Lewisham some time in the early afternoon.
Would you be able to provide any reason that this is a wonderful work of fiction (that to be honest rivals Dan Brown in terms of historical accuracy) was sent out?
> Date: Mon, 14 Jun 2010 15:45:04 +0100
> From: noreply@nexusalpha.com
> To: Elliot Uttridge
> Subject: No known disruption: London Cannon Street to Gravesend
>
> Dear Elliot Uttridge,
>
> There are no disruptions reported at this time affecting services between your selected stations London Cannon Street to Gravesend.
>
> For the latest live train running updates please see http://www.southeasternrailway.co.uk/live-running-information
>
> To change your settings, suspend your alerts, or to unsubscribe from the Southeastern Alerting Service, please log in to
> your user account at http://www.journeycheck.com/southeastern/login
Thanks
Elliot
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comment that we received on 15 June 2010.
Information problems
I am very sorry to learn about the difficulties that you encountered on 14 June whilst travelling with Southeastern. I understand that this stems from incorrect service information that we sent to you in an email. I am sorry that you were not given the correct advice. I also apologise for the inconvenience that resulted.
It may be useful to explain how we update our train running information. The information that we are able to provide is always a reflection of the current service, but details are always a little behind things actually taking place on the network. The train running information we send out by email (and provide on our website) is updated by employees in our Control Centre. This is the same team that makes decisions about how the service operates, so in times of disruption will choose which services are to be cancelled, diverted, and so on, in an effort to 'recover' the service. So as soon as a decision is made it can be published on websites and sent out in emails.
As you’d expect we always set out to run a good service and work with Network Rail overnight to try to ensure the infrastructure is able to support the service we operate. This means that first thing in the morning, information systems will show the day’s timetable information and not give an indication that there may be potential problems to come. Unfortunately it's only when things go wrong that we're able to update the information and note the subsequent problems of cancelled and delayed service that will follow. We try to keep email information as up to date as possible and, where possible, provide information about the average length of delays. That said we'll still only be able to say there's disruption on a particular line after the problems have already started.
When disruptions occur, we do expect our staff to make announcements to keep passengers informed of the situation. But there can be occasions when they may be awaiting information themselves from either our Operations Centre or Network Rail (the company that owns and maintains the rail infrastructure). All the same, we should keep passengers informed, or at least offer an apology when we are awaiting information. Although I’m hopeful that they’ll do their best under what can often be difficult circumstances, I’m sorry for the problems that you experienced and for any difficulties that this caused you.
I sincerely apologise for these problems, and hope you do not encounter similar difficulties again. Nevertheless, I regret to say that such information problems are inevitable during severe weather conditions, and is a problem that all train operating companies face. I'm sure you will understand this when you consider that there are over 400,000 passengers that use our services each day, and many will need to find out about changes to scheduled services at times of disruption.
Yours sincerely
Southeastern
Wednesday, 26 May 2010
26 May 2010
Email to Southeastern:
Dear SouthEastern,
Re: http://www.southeasternrailway.co.uk/your-journey/daily-performance/
On the daily performance page it still appears to be displaying information from the 20th May. I can appreciate that sometimes the information on this page may be a little out of date however no update for 6 days seems a little excessive.
I can only assume that you need some extra time to alter these figures to hide the truly appalling service that you have provided over the last couple of day (although I did enjoy Mondays overshoot and subsequent shunting back at London Bridge, it was like being at Alton Towers but without the queues!) Alternately you may just be hoping that no one notices that you've not updated this page and realises just how bad the performance has been.
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comment that we received on 26 May 2010.
Train performance data
I understand that you have concerns about the daily performance information, and the performance and reliability percentages shown on our website. To address your concerns, it may be helpful to explain how the figures are calculated. There are four types of data that we display on the website:
Daily Performance Information
Public Performance Measure
Passengers Charter Performance: Punctuality
Passengers Charter Performance: Reliability
Daily Performance Information
We endeavour to show all trains that were either cancelled or delayed by over ten minutes, and a brief reason for the disruption on our website. We aim to publish this information as frequently as possible, and we are usually able to update it every day. The data for a particular day's service is usually displayed on the website within a few days.
We also aim to show the number of services we ran and the percentage of those that arrived at their destinations within five minutes. This is because we wish to be open and transparent regarding the service that we provide.
We have no obligation to show this detailed information and we are the only train operator to do so. Train performance data are acquired from Network Rail data and their track-based equipment. It is an independent monitoring system and is not something we can adjust.
Public Performance Measure (PPM)
The Public Performance Measure (PPM) shows the number of trains arriving at their destination within 4min 59sec of the timetable advertised time having called at all stations that they is booked to call at, displayed as a percentage of the total number of trains timetabled for the given day. No event is excludable from this figure and the figure is published every 4 weeks with both a Period result and an average value over 13 Periods (1 year) result.
Passengers Charter Performance
The Passengers Charter performance figures are split into punctuality and reliability. These are calculated as follows:
Punctuality
Punctuality applies to trains Monday – Friday which either arrive at a London Terminal between 06:00 – 09:59 or depart a London Terminal Station between 16:00 – 18:59 these are known as 'The Peaks'. The measure is the number of (qualifying) trains arriving at their destination within 4min 59sec of the timetable advertised time having called at all stations that they is booked to call at, displayed as a percentage of the total number of (qualifying) trains that actually ran on the day. Certain events are excludable from this figure and the figure is published every 4 weeks with both a Period result and an average value over 13 Periods (1year) result.
As an example, a train which arrives at Victoria at 08:50 against a booked time of 08:42 (8 late) which lost 5mins due to snow and 3min due to a late driver would always be a PPM failure but may not be a Passengers Charter failure as the snow delay is excludable under the National Rail Conditions of Carriage, and in the Passengers Charter calculation the train will have arrived 3mins late
Reliability
Reliability applies to trains Monday – Friday all day. The measure is the number of trains that did not run (or ran less than 50% of their booked journey) against the total booked to run on the day. This is subtracted from 100% to give the overall reliability result. Certain events are excludable from this figure and the figure is published every 4 weeks with both a Period result and an average value over 13 Periods (1year) result.
Take as an example, 2000 trains booked to run, of which 20 did not. In this example, 10 did not run due to snow and 10 did not run due to a unit defect. Because we are excluded from liability from certain events (as outlined in the National Rail Conditions of Carriage), and this includes severe weather conditions, the 10 that did not run due to the snow will be excluded from the calculation. Therefore, the reliability figure is 100% - (10/1990) = 99.5%. The website quotes the total number of trains booked and the total number that ran on the day.
It should be noted that it is not always possible to simply extract the data from the website to determine the correct measures for Punctuality and Reliability. Indeed we have a dedicated quality data specialist whose role is to ensure ALL data is correct. We are also independently audited each year by Sheffield University to ensure data integrity.
Finally, with regard to exclusion of liability in relation to Passenger's Charter data, the relevant condition of the National Conditions of Carriage is as follows:
"45. Circumstances that are not within a Train Company’s control
For the purposes of Conditions 42 and 43, circumstances that are not within a Train Company’s control include:
(a) acts or threats of vandalism or terrorism;
(b) suicides or accidents involving trespassers;
(c) gas leaks or fires in lineside buildings not caused by a Train Company or a Rail Service Company or any of their employees or agents;
(d) line closures at the request of the police or emergency services;
(e) exceptionally severe weather conditions;
(f) industrial action by a Train Company’s, or Rail Service Company’s, staff or agents or by any other person;
(g) riots or civil commotion; and
(h) fire, mechanical or electrical failure or a defect (except where this is caused by a
Train Company or Rail Service Company or their employees or agents, or as a result of the condition of a Train Company’s trains)."
I hope this helps to clarify how the performance figures are calculated, and thank you for your enquiry.
Re: http://www.southeasternrailway.co.uk/your-journey/daily-performance/
On the daily performance page it still appears to be displaying information from the 20th May. I can appreciate that sometimes the information on this page may be a little out of date however no update for 6 days seems a little excessive.
I can only assume that you need some extra time to alter these figures to hide the truly appalling service that you have provided over the last couple of day (although I did enjoy Mondays overshoot and subsequent shunting back at London Bridge, it was like being at Alton Towers but without the queues!) Alternately you may just be hoping that no one notices that you've not updated this page and realises just how bad the performance has been.
Southeastern reply:
Dear Mr Uttridge
Thank you for your website comment that we received on 26 May 2010.
Train performance data
I understand that you have concerns about the daily performance information, and the performance and reliability percentages shown on our website. To address your concerns, it may be helpful to explain how the figures are calculated. There are four types of data that we display on the website:
Daily Performance Information
Public Performance Measure
Passengers Charter Performance: Punctuality
Passengers Charter Performance: Reliability
Daily Performance Information
We endeavour to show all trains that were either cancelled or delayed by over ten minutes, and a brief reason for the disruption on our website. We aim to publish this information as frequently as possible, and we are usually able to update it every day. The data for a particular day's service is usually displayed on the website within a few days.
We also aim to show the number of services we ran and the percentage of those that arrived at their destinations within five minutes. This is because we wish to be open and transparent regarding the service that we provide.
We have no obligation to show this detailed information and we are the only train operator to do so. Train performance data are acquired from Network Rail data and their track-based equipment. It is an independent monitoring system and is not something we can adjust.
Public Performance Measure (PPM)
The Public Performance Measure (PPM) shows the number of trains arriving at their destination within 4min 59sec of the timetable advertised time having called at all stations that they is booked to call at, displayed as a percentage of the total number of trains timetabled for the given day. No event is excludable from this figure and the figure is published every 4 weeks with both a Period result and an average value over 13 Periods (1 year) result.
Passengers Charter Performance
The Passengers Charter performance figures are split into punctuality and reliability. These are calculated as follows:
Punctuality
Punctuality applies to trains Monday – Friday which either arrive at a London Terminal between 06:00 – 09:59 or depart a London Terminal Station between 16:00 – 18:59 these are known as 'The Peaks'. The measure is the number of (qualifying) trains arriving at their destination within 4min 59sec of the timetable advertised time having called at all stations that they is booked to call at, displayed as a percentage of the total number of (qualifying) trains that actually ran on the day. Certain events are excludable from this figure and the figure is published every 4 weeks with both a Period result and an average value over 13 Periods (1year) result.
As an example, a train which arrives at Victoria at 08:50 against a booked time of 08:42 (8 late) which lost 5mins due to snow and 3min due to a late driver would always be a PPM failure but may not be a Passengers Charter failure as the snow delay is excludable under the National Rail Conditions of Carriage, and in the Passengers Charter calculation the train will have arrived 3mins late
Reliability
Reliability applies to trains Monday – Friday all day. The measure is the number of trains that did not run (or ran less than 50% of their booked journey) against the total booked to run on the day. This is subtracted from 100% to give the overall reliability result. Certain events are excludable from this figure and the figure is published every 4 weeks with both a Period result and an average value over 13 Periods (1year) result.
Take as an example, 2000 trains booked to run, of which 20 did not. In this example, 10 did not run due to snow and 10 did not run due to a unit defect. Because we are excluded from liability from certain events (as outlined in the National Rail Conditions of Carriage), and this includes severe weather conditions, the 10 that did not run due to the snow will be excluded from the calculation. Therefore, the reliability figure is 100% - (10/1990) = 99.5%. The website quotes the total number of trains booked and the total number that ran on the day.
It should be noted that it is not always possible to simply extract the data from the website to determine the correct measures for Punctuality and Reliability. Indeed we have a dedicated quality data specialist whose role is to ensure ALL data is correct. We are also independently audited each year by Sheffield University to ensure data integrity.
Finally, with regard to exclusion of liability in relation to Passenger's Charter data, the relevant condition of the National Conditions of Carriage is as follows:
"45. Circumstances that are not within a Train Company’s control
For the purposes of Conditions 42 and 43, circumstances that are not within a Train Company’s control include:
(a) acts or threats of vandalism or terrorism;
(b) suicides or accidents involving trespassers;
(c) gas leaks or fires in lineside buildings not caused by a Train Company or a Rail Service Company or any of their employees or agents;
(d) line closures at the request of the police or emergency services;
(e) exceptionally severe weather conditions;
(f) industrial action by a Train Company’s, or Rail Service Company’s, staff or agents or by any other person;
(g) riots or civil commotion; and
(h) fire, mechanical or electrical failure or a defect (except where this is caused by a
Train Company or Rail Service Company or their employees or agents, or as a result of the condition of a Train Company’s trains)."
I hope this helps to clarify how the performance figures are calculated, and thank you for your enquiry.